Fitness Center Lake Howell

Project Info

Complete renovation of the Fitness Center, including demolition, surface preparation and painting, new flooring installation, and electrical upgrades.

Client

Cortland

Location

Florida, USA

Project Year

2026

Project Head

Merak — Operations Manager

Screenshot
Watch VIdeo
Screenshot

Project Description

• Demolition and removal of existing elements.
• Removal of existing finishes and damaged components.
• Surface preparation and leveling.
• Wall and ceiling repairs.
• Interior painting of renovated areas.
• Installation of new flooring throughout the fitness area.
• Floor surface preparation prior to installation.
• Installation and finishing of baseboards and trim.
• Renovation and upgrade of electrical systems.
• Installation of new electrical outlets and connection points.
• Inspection and organization of wiring and lighting.
• Final cleaning and turnover of the Fitness Center.

Share to Social Media Now!

Elevate Your Voice and Expand Your Reach by Sharing Engaging Content Across Diverse Social Media Networks, Igniting Connections Worldwide!

Esta web utiliza cookies propias y de terceros para su correcto funcionamiento y para fines analíticos y para mostrarte publicidad relacionada con sus preferencias en base a un perfil elaborado a partir de tus hábitos de navegación. Contiene enlaces a sitios web de terceros con políticas de privacidad ajenas que podrás aceptar o no cuando accedas a ellos. Al hacer clic en el botón Aceptar, acepta el uso de estas tecnologías y el procesamiento de tus datos para estos propósitos.
Privacidad